    Topic: How to link Node and Transmission line in NEMO with LEAPSubscribe | Previous | Next
  • Liu Mingkai 11/7/2022

    Dear LEAP-NEMO team,

    I got two questions; the first is about how to model multiple regions and regional electricity trade in LEAP. Can I set the maximum capacity support by line?

    The second is how to set the Node and Transmission line in the LEAP user interface, or can it only be run from a command line in NEMO?
    If It can be run from a command line in NEMO, how to link the data in LEAP with NEMO to optimize the electricity system with transmission?

    Thank you,
    Sincerely Mingkai.

    微信截图_20221107205036.png
  • Charlie Heaps 6/8/2023
      Best Response

    1 Like

    Hi Liu, I'm afraid this functionality in NEMO is not (yet) supported in LEAP. We plan to add this in a future release.