1835 Views
Hi Tory,
I meet the same question with the Dina's.
-the version of LEAP:2012.0.0.47
-I followed the exercise 6, and when I want to see the result, the error appeared.
-"System Peak Load Shape variables must be specified with a yearly shape of type: "Peak Load Shape". The base year shape you selected is type: Energy Load Shape
Go to the General: Yearly Shapes screen to view the current library of yearly shapes.
Branc:Transformation\Electricity Generation
Variable:System Peak Load Shape
Scenario:Current Accounts
Year:2010
Expression:YearlyShape(System Load Shape)"
Need your help.
Thanks!
Yuan