2503 Views Hi Taylor,
2502 Views Hi Madeleine,
2500 Views Hi Taylor,
2490 Views Just to clarify my last post a little, I have made a couple more observations. I had been using the Dispatch Rule In Order of Running Cost. I had included Variable OM costs for each of the generators based on their 2012 bid prices, but zero for their capital cost and Fixed OM costs. This resulted in the situation described above where all electricity from 2013 (first simulation year) onward are imported instead of produced domestically. I checked the Base Year Reserves and Yield, and both are set to 1 million trillion GWh, so there should be ample reserves to generate the electricity domestically. However, when I switched the dispatch rule to Full Capacity, the problem seemed to be fixed. There were no imports to the module (which there shouldn't be as I have lots of capacity and lots of reserves), and all electricity demand was met with domestic production. Of course the exports were extremely high since all the plants were operating at full capacity, which is not representative of reality. When I changed the dispatch rule to Merit Order (and assigned Merit Orders to each of the generators), then the situation reverted to the situation when I had the dispatch rule In Order of Running Costs- i.e. electricity was imported from the base year onward instead of being produced domestically.
3 Likes 2489 Views Hi Madeleine,
2480 Views Thanks Taylor,
2475 Views Hi,