Greetings,
From https://www.energycommunity.org/Help/Transformation/Minimum_Addition_Size.htm?rhhlterm=mixed%20integer&rhsyns=%20 I realized that after I activated check box on General:Basic Parameter -> Optimization Tab -> Addition Size using Mixed Integer Linear Programming, I can use LEAP and OSeMOSYS to determine optimized generation addition using certain number, not in continuous variable like usual optimization (eventhough I have to face slower computation, I accept it.)
The question: How do I properly input the power plant capacity candidates if there are more than 1 candidate values?
For example, for coal power plant, I have 300MW and 600MW candidates.
For machine gas power plant I have 100MW and 800MW candidates.
For hydro power plant, I have 250MW and 500MW candidates.
Thank you for anyone who will answer my question. I really appreaciate it.
Wicaksono