Is it possible, outside of the cost optimization mode, to limit endogenous capacity additions to a certain maximum value? Let's say I have two endogenous technologies, one of which I know is available but limited in maximum capacity, whereas the other one is not limited in the same way. Can this be implemented in LEAP?