    Topic: electricity transformationSubscribe | Previous | Next
  • Ali Tamoor 3/27/2020

    please check what can be error. the total electricity generation is now okay but the sudden change in thermal and hydel generation is exchanged. in 2018 thermal generation was more than hydel but in 2019 both are exchanged at half what is error

    Untitled.png
  • Utsavshree Rajbhandari 5/2/2020
      Best Response

    Have you developed your generation model based on Merit basis like as in Leap Tutorial?
    If so, the hydro has been put there in 1st merit, i.e. it would be utilized first and if more capacity is required, the 2nd and 3rd merit plants would run as per model.
    In year 2018, the base year, the data are explicitly provided and thus shows in correct order, however in later years the production are based on the model parameters provided.