• 263 views | 5 messages Discussion: LEAP
    Topic: Capital Cost of Transmission and DistributionSubscribe | Previous | Next
  • Han Jiang 4/9/2021

    3 Likes

    I find that LEAP does not consider the cost of expansion of the transmission system. There is not way to input the Capital Cost of electricity grid or nature gas grid.

    How could I simulate the cost of expansion of the transmission system ?
  • Charlie Heaps 4/9/2021
      Best Response

    4 Likes

    I'm guessing you are looking at the sample LEAP data set that has a simplified model of transmission and distribution. That is just one model. You can create your own models that do model T&D in more detail. In particular you would need to specify capacity data for any transmission module. Understandably, LEAP only asks for capital costs if you also specify data on capacity.
  • Flady Cordero 4/9/2021
      Best Response

    3 Likes

    Interesting!. The T&D system could be modeled under the following structure:



    Instead of simply modeling system losses, include capacity (MWA or MW)? Just transmission or transmission and distribution?
  • Han Jiang 4/11/2021
      Best Response

    Thanks very much!I am a new user of LEAP. Could you kindly share a sample case for modeling the cost of transmission and distribution in capacities(MW)?
  • Han Jiang 4/11/2021
      Best Response

    Thanks for your prompt reply!
    If it possible, could LEAP share a new sample to model the cost of grid expansion?