I use Resource Imports module and Unmet Requirements module.
Negative unmet requirements mean energy is being produced in surplus. It looks like the electricity demand was exactly balanced by production in the Transformation modules but then there is a (perhaps) exogenously specified level of electricity imports which are not needed to meet demand. Check the resource branches to see if you have specified any "hard-wired" electricity imports.