• 137 views | 4 messages Discussion: LEAP
    Topic: Renewable Target disappearSubscribe | Previous | Next
  • Liu Mingkai 6/1/2023

    Hello,

    The Renewable Target has disappeared? How can I get it back?

  • Taylor Binnington 6/6/2023
      Best Response

    1 Like

    Hi Liu -

    The Renewable Target variable is only visible when viewing scenarios that are optimized using NEMO or OSeMOSYS. Check the "Optimize" variable and ensure it does not read "No".

    Note that occasionally, variables that are associated with optimization require some additional screen-refreshing in order to appear. You can do this by closing and re-opening your model, or sometimes by selecting another branch in the tree before returning to the Electric Generation branch.

    Good luck,
    Taylor
  • Charlie Heaps 6/7/2023
      Best Response

    1 Like

    Hello - this variable has moved. It is now located underneath the high level LoadShapes branch. Please make sure you get the latest version of LEAP 2020.1.97 as the variable was incorrectly hidden in some earlier versions.
  • Liu Mingkai 6/8/2023
      Best Response

    Thank you, Taylor and Charles! Thanks to the LEAP Team, you guys really have made consistent efforts to optimize the software and contribute to the energy model over the years!