Hello.
In the transformation branch, by creating a branch of Power Plants, is it possible to insert battery banks in processes as a storage process when the expansion of the electrical system is carried out through endogenous capacity?
It is that when looking at the results, the values of battery banks are not quantifiable.
Or the Storage Process option can only be used during an optimization with NEMO.
Greetings.