• 137 views | 2 messages Discussion: LEAP
    Topic: Hourly ProductionSubscribe | Previous | Next
  • Georgios Zisopoulos 12/1/2023

    Hello! I am working on a model that depicts the electricity production and consumption in Greece including seasonal storage. To achieve that, I have to somehow insert the hourly production of RES plants, since I am basing the electricity production almost exclusively on solar PV, wind turbines and hydroelectric power plants. Please let me know if you have any suggestions on the topic.
    Bellow I have included the structure of the model

    Thank you.

    Screenshot 2023-12-01 161902.png
  • Robert Brecha 12/8/2023
      Best Response

    For hourly production of variable electricity sources you must make use of an "availability load shape". An intro to this process is shown in the LEAP training video SIDA #3 https://www.youtube.com/watch?v=6suTuLr9bOE
    Basically, you must have a spreadsheet open in which a column of hourly data for production as a percentage of maximum capacity are given (e.g. 50, not 0.5, for 50%). This can be read into LEAP as a load shape (availability) and then under your transformation branch for that technology (e.g. solar pv) you would choose for "Maximum availability" that new load shape.