Hello, I am working on a model that depicts the electricity production and consumption in Greece including seasonal storage. To achieve that, I have to insert the hourly production of RES plants, since I am basing the electricity production almost exclusively on solar PV, wind turbines and hydroelectric power plants. Please let me know if you have any suggestions on the topic.
Dear Eleni Ntemou,
In your consultation, the structure to be modeled was not clear. If you
want to model storage you should use optimization (NEMO)
We suggest reviewing LEAP Training Materials:
https://leap.sei.org/default.asp?action=trainingmaterials
On YouTube (LEAP Platform):
Sida LEAP Training Lecture #3: Energy Supply Modeling https://www.youtube.com/watch?v=6suTuLr9bOE
Sida LEAP Training Lecture #6: Optimization Modeling with LEAP and NEMO https://www.youtube.com/watch?v=RjwtX2eL7tM&t=3945s
Hoping they are useful, I say goodbye
Flady Cordero
Hi,