• 136 views | 4 messages Discussion: LEAP
    Topic: Error in load shapesSubscribe | Previous | Next
  • Eleni Ntemou 12/20/2023

    Hello, I am trying to introduce the efficiency of different RES. I created a new shape with the production percent relevant to my base year of the RES plants and and tried to introduce it to to Maximum Availability, following the steps from this topic https://leap.sei.org/default.asp?action=9&fid=22&TID=4266 .

    Unfortunately I get the following error.

    Screenshot 2023-12-20 091610.png
  • Taylor Binnington 4/2/2024
      Best Response

    Hi Eleni -

    I don't see an error in your screenshot, but if you're trying to entered time-sliced availability data - something you might later assign to the Maximum Availability variable - then you should enter your information using an Availability Shape. It looks like you've entered it using an Energy Load Shape.

    Taylor
  • Battsengel Lkhagvademberel 4/6/2024
      Best Response

    Hello.
    Also, I have the same problem. Can you help me when I set in Maximum Availability?
    Thank you.

    1.jpg
  • Charlie Heaps 8/16/2024
      Best Response

    Please update to the latest version of LEAP (currently 2024.1.0.7) which now provides more flexibility in handling of yearly shapes.