Hello, I am using the current version of LEAP: Version: 2024.1.1.9 (64-Bit)
But I am not able to see and set the planning reserve margin variable. When opening the Electricity generation branch, to set up Planning reserve margin, Peak laod etc, there is no data available as shown in the attached screenshot.
Planning reserve margin was moved in LEAP2024. It is now specified per fuel at the branches under the high level Load Shapes branch as shown in the attached figure.
BTW - there is a bug in how LEAP reports reserve margin values in 2024.1.1.9 in optimization-based scenarios. A fix for this is coming in the next release.
I have downloaded the last LEAP software version 2024.2.0.10 (64-Bit), I am following the LEAP training but I am stuck because I cannot find the tab for "Planning reserve Margin" as you can see in the image below. Where can I find the opton?
Sorry for the confusion Luis. In the latest version, that variable has moved again. It is now located at the module branches where relevant (e.g. Transformation\Generation).