In our power sector model, the constraints for minimum and maximum production are completely ignored. The minimum share of production constraint operates correctly, strangely. I have tested various types of values and inputs so it does not seem to be related to units. Do you have an idea of what might be causing this problem? For additional context, we've enabled optimisation for a single transformation branch which includes the process we want to cap.
Cheers,